| | Deperming Pier & Dredging |  | | The project was the retro up-grade of the complex array of surface structures and under-water cables for the only mag-netic silencing facility in the world that has the electrical ca-pability of deperming an air-craft carrier or (CVN Class). The project included the recon-struction of several 1,500' x 10' wide piers using non-magnetic concrete piles, precast concrete deck and cast-in-place concrete moorings. All of the reinforcing steel and metals for this project were stainless steel. | | Client: U.S. Navy | | Location: Norfolk, VA | | Contract Value: $11,449,565 | | Duration: 25 Months | | Further Information: Tidewater Skanska, Inc. 809 South Military Highway Virginia Beach, VA 23464 Phone 757 420 4140 Fax 757 420 3551 | | |
| | | | |
|
 |
 |
 |
|